4.2   Power-on

(1)  Check the items before power-on.

        The equipment is properly grounded.

        The power cord is reliably connected.

        The input voltage meets the requirement.

        The Ethernet cable is properly connected, and the client such as a PC used for configuration is already turned on.

(2)  Power on the equipment.

(3)  Check the items after power-on.

After the equipment is powered on, check the following items:

        The system status LED works properly.

        Service ports can forward data properly.